HVAC stand for heating, ventilating and air conditioning,
with main goal is to provide acceptable indoor air quality and thermal comfort.
HVAC is important inside the layout of medium to big business and office
buildings together with skyscrapers, onboard vessels, and in marine
environments such as aquariums, wherein safe and healthy constructing
conditions are regulated with recognize to temperature and humidity, the usage
of fresh air from outdoors.
The main idea of the system is a solitary bureau blower and
loop air handler that is intended to fit in tight spaces while giving
proficient cooling and warming from its refrigeration coil.
Consider few steps for Successfully HVAC Installation
Calculate the Load
Find a Suitable Location for the Fan Coil Unit
Cut the Return Air Opening
Construct a Simple Platform
Attach Supply Plenum Ring
Connect the Condensate Drain
Connect Refrigerant Lines
Connect Supply Tubing and Plenum Duct
Install Terminator Outlets and Sound Attenuation Tubing
Install Supply Tubing
From the above points your first step should be identifying
the load calculations. Find out load balancing of room by room in any building
and install system accordingly.
The fan coil unit might be situated in any unconditional
space, but you should find a proper space for Fan coil unit. The fan coil unit
may also be located in a conditioned space such as a utility room, basement or
closet. Two types of fan coil configuration are offered - horizontal and
vertical cabinets.
Choose your proper location for the return air duct. Don’t
use installing the return air box in a living room, dining room, or kitchen
unless the air duct can be installed with a 180-degree bend.
Try to construct a simple platform based on the size of the
fan coil unit. It is highly recommended to use 2- by 8-inch stud lumber and a
minimum of 1/2-inch plywood for platform for construction. Try to use the
provided isolation strips under the unit for best results.
Keep in mind that the supply plenum ring will be a few
inches lower than the base of the fan curl unit. It will be important to move
the fan loop past the stage edge to suit the plenum ring. The plenum ring
connects to a square opening with four screws gave. You are currently prepared to interface the condensate
channel trap (supplied) to the fan loop unit. Allude to the directions with the
supplied condensate channel trap. Continuously run the condensate channel line
from the trap to a reasonable channel as per neighborhood codes.
Interface the refrigerant lines from the open air
consolidating unit to the indoor fan loop unit. Continuously take after the
gathering unit (outside unit) maker's directions for introducing, estimating,
catching, charging, and utilizing channel dryers. At the point when introducing the air dispersion parts, it is dependably a smart thought to do a framework design in light of your measuring parameters. The plenum conduit might be keep running in for all intents and purposes any area that is available for the connection of the supply tubing.
If you are looking for HVAC Contractors or HVAC Services near you, Just visit below website and get the list of all HVAC Companies behind you.
Click Here-->
www.hvaccontractornearme.com |
No comments:
Post a Comment